Displacement Sensor Failure Analysis and Solution

I. INTRODUCTION The original capacity of the Jiaozuo Power Plant was 6×2OOMW. After several years of capacity expansion, the total installed capacity has reached 132OMW. Since October 1999, Jiaozuo Power Plant has used a major overhaul to carry out a complete DEH system transformation of th