Project Name: Phase II Construction Project of Yintan Wanquancheng Area: Guangxi Progressive Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, cranes, excavators, electrical facilities, Ventilation facilities (for reference only)
Brief introduction of the project: The project is located in the Second Development Zone of Beihai Modern Industrial City, which is north of the Gold Coast Avenue and west of Guangdong Road. The total investment of the project is 800 million yuan. The planned total land area is 142,690.13 square meters, the total construction area is 277,967.55 square meters, the greening rate is 34%, the plot ratio is 1.8, the total number of households is 2834, and the parking spaces for motor vehicles are 1,570. The project consists of two phases. One phase consists of 34 middle-rise residential buildings and a centralized business district. The second phase consists of 31 high-rise residential buildings and kindergartens and other ancillary facilities. The total investment of the project is 800 million yuan.
Construction Unit: Beihai Wanxiang Real Estate Development Co., Ltd. Postal address: Beihai City, Guangxi Zip Code: 536000 Contact person: Wu Changbo Telephone Design Unit: Guangzhou Huanfa Environmental Engineering Co., Ltd. (EIA)
Postal address: No. 84, Guangta Road, Yuexiu District, Guangzhou 5100000, PRC Contact: Luo Gong
phone
Related Developments: Tower Crane Infrastructure Project

Sheet Metal

Sheet Metal Fabrication Services,High Precision Sheet Metal Fabrication Services,Custom Sheet Metal Parts,Sheet Metal Parts Oem Factor

Dongguan ganzoo prototype manufacture co.,ltd , https://www.dgpmsheetmetal.com