Mobile stage cars are often required to go to all parts of the country to promote the show, so long-term driving mobile stage cars, in the end is the number of driver friends know that in those time driving vehicles are more prone to fatigue and danger? It is estimated that many of the friends of mobile stage car drivers do not pay attention to it at all. In fact, when people drive vehicles for a specific period of time, people will appear unresponsive, distracted, and visually influential. When the mobile stage car driver drove, it directly affected the judgment. Therefore, it is imperative that the friends of the mobile stage car drivers pay special attention when they drive to bring their team to the field for performances and publicity.

哪些时间段驾驶流动舞台车容易疲劳.jpg

1. From 24:00 in the evening to 2:00 in the morning, generally the big guys have fallen asleep during this period of time. This is also the period of time that needs to be rejuvenated after excessive energy consumption. If a mobile stage vehicle drives a vehicle at this point, then the road will not be like the daytime. There will be many passing vehicles and they will be overtaking and speeding on such a quiet and unimpeded road. Because human physiology time causes the human's brain to appear stiff and numbness of hands and feet, as well as numbness, unresponsiveness, and the like. If the vehicle is inattentive, it may cause a traffic accident.

2. Between 11 noon and 1 pm, after eating lunch, it is usually necessary to take a break and put the hour on it. The physical energy consumed in the morning will be supplemented here. Moreover, the driver's brain nerve is also the most fatigued during this period of time, and the person's responsiveness level is also reduced a lot. If the mobile stage car driver delays the normal lunch time in order to arrive at the destination early, the brain consumption will not keep up with the physical strength. In addition, after eating a full meal, we should not be driving a mobile stage car. When the driver is full, the long tail digestive organs in the body will begin to move, and the blood supply to the brain will be reduced directly. Then there will be short-term distractions and tiredness. At this moment, it is best to rest in the car or find a place. Then 30-60 minutes is also possible. Don't be anxious to get yourself a car. Life is a child's play.



HGY5101GLQ Emulsion Asphalt Distributor is researched and developed by our company on the basis of many years of construction and equipment design experience combined with the present road conditions. It is one of the series of asphalt distributing machinery which is easy-operated, economical and practical. It is professional construction equipment specialized in spraying emulsified asphalt.

Main Performance:

a.It adopts Euro V Jiefang chassis, which has advantages of large bearing capacity, high power, low fuel consumption and emission, easy operation and reliable breaking;

b.Equipped with  auxiliary engine, to realize the heating when walking, shorten work time , improve the work efficiency.

c.It adopted fully automated control, high degree of automation, automatic control asphalt spray width, can accurately calculate the spray volume when working;

d.It adopts special asphalt valve group structure, high degree of automation, reduces labor intensity.

e.This equipment reduces the construction labor intensity, budgets and human resources, improves the work efficiency and work quality.;

f.Good anticorrosive and durable insulation layer makes sure the temperature drop no more than 12℃/8h (Under normal temperature ).;

g.The tank adopts imported diesel burner, high combustion efficiency and high heating efficiency, automatic ignition and automatic temperature control system, operation security and stability.

h.It can spray hot (modified) asphalt, diluted asphalt, emulsified asphalt, etc.;

i.Spray bar can be folded and the height can be adjusted.;

j.It adopts high processing precision of nozzle, to realize each nozzle spray consistency and efficiency.

k.Asphalt pump adopts domestic brand internal gearing pump,high output ,stable flow rate, good seal performance and compacted structure.

l.Humanized design of control system could not only control remotely, but also operate on site, which makes the operation more convenient;

m.It is perfect combination by electrical control and hydraulic system, to realize the zero initial spray;

n.With much engineering construction experience, we improve the equipment to make it more reliable in performance and more convenient in operation and maintenance..

Emulsion Asphalt Distributor















Emulsion Asphalt Distributor

Emulsion Asphalt Distributor,Asphalt Emulsion Palnt,Emulsion Asphalt Sprayer Distributor,Asphalt Road Emulsion Distributor

Henan Gaoyuan Road Maintenance Equipment Co., Ltd. , https://www.sgroadmachinary.com